If 5 men can dig 18 metres ditch in 12 hours, in how many hours will 15 men working at the same rate dig 27 metres ditch?
Upstudy AI Solution
Answer
Solution
Answered by UpStudy AI and reviewed by a Professional Tutor


Bonus Knowledge
To solve the problem, first, we find the work rate of the 5 men. They dig 18 meters in 12 hours, so their rate is: Rate = 18 meters / 12 hours = 1.5 meters per hour for 5 men. Now, for 1 man, it would be: Rate per man = 1.5 meters/hour / 5 = 0.3 meters/hour. Next, we calculate the rate for 15 men: Rate for 15 men = 0.3 meters/hour * 15 = 4.5 meters/hour. Now, to dig a 27 meters ditch, the time required can be calculated as: Time = Distance / Rate = 27 meters / 4.5 meters/hour = 6 hours. So, 15 men working at the same rate will dig a 27-meter ditch in 6 hours. Hope that helps!