14. You did 170 J of work lifting a 140 N backpack. How high did you lift the backpack? Type a response 15. A crane does 62,500 J of work to life a boulder a distance of 25.0 m . How much did the boulder weigh? Type a response
Upstudy AI Solution
Answer
Solution

Sign in to Unlock Answers for Free!
A Learning Platform Trusted by Millions of Real Students and Teachers.

Answered by UpStudy AI and reviewed by a Professional Tutor
Beyond the Answer
To find out how high you lifted the backpack, you can use the work formula: Work (W) = Force (F) x Distance (d). Rearranging the formula gives you Distance (d) = Work (W) / Force (F). Plugging in the numbers: 170 J / 140 N = 1.21 m. So, you lifted the backpack approximately 1.21 meters high. To determine the weight of the boulder, you can use the same work formula. Rearranging gives you Force (F) = Work (W) / Distance (d). Here, you have W = 62,500 J and d = 25.0 m. So, F = 62,500 J / 25.0 m = 2,500 N. Therefore, the boulder weighs 2,500 Newtons.